how to change order of tabs

  • Author
    Posts
  • #163252

    I’m trying to re-order the tabs on the home page and haven’t been able to. I’d like Make a Tax-Deductible Donation to be the first tab that’s displayed, and The Issues to be the second (unselected tab). How can I accomplish this?

    The blog I need help with is speakforwolves.org.

    #163258

    emilysuesrq
    Theme Author

    You will need to use a plugin, such as Post Types Order to rearrange the post order in the dashboard (in the Posts location within your dashboard). The plugin will allow you to drag and drop the posts in the order you’d like them to display.

The topic ‘how to change order of tabs’ is closed to new replies.